The new Second Avenue bridge being rolled into place across Interstate 94. The 5,000,000-pound network tied-arch bridge was built in a parking lot at Wayne State University and is rolled onto its supports on either side of the highway using a Mammoet self-propelled modular transporter system. Photographed in Detroit, Michigan, USA, on the 24th July 2022.

px px dpi = cm x cm = MB
Details

Creative#:

TOP28014473

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

N/A

Property Release:

N/A

Right to Privacy:

No

Same folder images:

Same folder images