
Repair Works at a canal lock in North Rhine-Westphalia, along the Wesel-Datteln Canal. The larger lock was completed in 1928 and has lift gates at both ends. It is 222 meters long, 12 meters wide and is designed for a draft of 2.80 meters, with a filling capacity of 26, 500 cubic meters. The inset bollards needed to be replaced in 2022
px | px | dpi | = | cm | x | cm | = | MB |
Details
Creative#:
TPG35789029
Source:
達志影像
Authorization Type:
RF
Release Information:
須由TPG 完整授權
Model Release:
No
Property Release:
No
Right to Privacy:
No
Same folder images:
desertednooneNoPeoplenobodyuninhabitedemptybroadwidemetermetersmetremetreslongbollardbollardsrepairrepairsendendssluicesluiceslocklocksNorthRhine-WestphaliaNRWFederalStateofNorthRhine-WestphaliaNorth-RhineWestphaliaGermanEuropeEuropeseuropeanGermanyGermanFederalRepublicRepublicofGermanyFRGBRDreplacereplacingreplacesreplacedassetassetswealthWeseldraftdraftsdraughtCentralEuropeMiddleEuropeRepairworkCapacityCanallock
BRDCanalCapacityCentralEuropeEuropeEuropeEuropesFRGFederalFederalGermanGermanGermanyGermanyMiddleNRWNoNorthNorthNorth-RhinePeopleRepairRepublicRepublicRhine-WestphaliaRhine-WestphaliaStateWeselWestphaliaassetassetsbollardbollardsbroaddeserteddraftdraftsdraughtemptyendendseuropeanlocklocklockslongmetermetersmetremetresnonobodyofofonerepairrepairsreplacereplacedreplacesreplacingsluicesluicesuninhabitedwealthwidework